Bridge and Rain By-Pass  
FOTF built a rain by-pass drainage on the south side of Solano County Fair, and a bridge extending to the 4 acre parking area behind the race track. This is where 4H and FFA (Future Farmers of America) stock trailers are parked. The project was done at a cost of $5000 and a total of 320 volunteer man hours.

Bridge to 4H & FFA four acre stock trailer parking area.
Electrical Upgrade for Concert Arena  
FOTF upgraded the electrical systems of the former Sports Arena to accomodate its transition into a full-fledged Concert Arena for headline entertainment at the fair. Friends of the Fair paid $21,000 for the upgrade.
The Solano County Fair Concert Arena
Water Truck  
FOTF purchased a used flatbed truck and mounted a water tank on the back. It was retrofitted to a working water truck for full time use at the fairgrounds, saving the cost of future water truck rentals during fair time. The project was completed at a cost of $10,000 and more than 100 volunteer man hours.
Solano County Fair Water Truck
   