| Bridge and Rain By-Pass |
|
FOTF built a rain by-pass drainage on the south side of Solano County Fair, and a
bridge extending to the 4 acre parking area behind the race track. This is
where 4H and FFA (Future Farmers of America) stock trailers are parked.
The project was done at a cost of $5000 and a total of 320 volunteer man hours.
|

Bridge to 4H & FFA four acre stock trailer parking area.
|
| Electrical Upgrade for Concert Arena |
|
|
FOTF upgraded the electrical systems of the former Sports Arena to accomodate
its transition into a full-fledged Concert Arena for headline entertainment
at the fair. Friends of the Fair paid $21,000 for the upgrade.
|

The Solano County Fair Concert Arena
|
| Water Truck |
|
|
FOTF purchased a used flatbed truck and mounted a water tank on the back. It
was retrofitted to a working water truck for full time use at the fairgrounds,
saving the cost of future water truck rentals during fair time. The project was
completed at a cost of $10,000 and more than 100 volunteer man hours.
|

Solano County Fair Water Truck
|